Free tool

Resume Action Verbs

90+ verbs organised by the claim they make — Build, Improve, Lead, Solve, Influence — and tagged by role family. Each comes with a worked example bullet you can adapt directly.

Filter by claim or roleOne-click copy on every exampleFree, no signup
Filter by claim
Filter by role family

Showing 90 of 90 verbs.

  • built

    Build

    Built the payment-retry service (Go + Kafka) recovering $420k of annually-lost transactions.

  • launched

    Build

    Launched the mobile checkout redesign across iOS and Android, lifting conversion 18% in 6 weeks.

  • shipped

    Build

    Shipped 4 major releases of the platform in 9 months, with zero customer-facing rollback incidents.

  • created

    Build

    Created the customer-360 mart used by 7 teams; cut ad-hoc analyst queries by 40%.

  • designed

    Build

    Designed the enterprise admin dashboard end-to-end; raised user-tested NPS from 6.4 to 8.1.

  • developed

    Build

    Developed the demand-forecasting model used by ops planning; cut weekly forecast error 18% → 7%.

  • established

    Build

    Established the EMEA partner-channel programme; sourced $1.4M in pipeline in the first 12 months.

  • founded

    Build

    Founded the platform-engineering function; grew the team to 6 engineers over 14 months at 91% retention.

  • implemented

    Build

    Implemented the company's first SOC 2 controls programme; passed first audit with no major findings.

  • engineered

    Build

    Engineered the streaming-events pipeline (Kafka → ksqlDB → Snowflake) powering 240k DAU notifications.

  • architected

    Build

    Architected the multi-tenant isolation model across 14 services; cut per-team onboarding from 4 weeks to 3 days.

  • authored

    Build

    Authored the team's API-design RFC adopted across 9 services; reduced design-review cycle time 35%.

  • produced

    Build

    Produced the 12-piece evergreen guide series driving 84k monthly organic visits in year one.

  • rolled out

    Build

    Rolled out the new CRM platform across 4 sales segments and 28 reps; 100% adoption within 30 days.

  • instituted

    Build

    Instituted the nurse-driven sepsis-screening protocol; cut median time-to-antibiotics from 84 to 32 minutes.

  • introduced

    Build

    Introduced the engineering-incident postmortem template; adopted across 12 squads in two quarters.

  • drafted

    Build

    Drafted the FY25 board-pack template; cut median CFO prep time from 22 hours to 8 per cycle.

  • set up

    Build

    Set up the team's first observability stack (Prometheus + Grafana); cut mean-time-to-detect 62%.

  • spun up

    Build

    Spun up the EU-payments compliance workstream; reached PSD2 readiness in 11 weeks.

  • pioneered

    Build

    Pioneered the product-led-growth motion across the SMB segment; cut sales-assisted CAC payback 14 months → 6.

  • cut

    Improve

    Cut p95 API latency from 480ms to 90ms by redesigning the cache layer (Redis tiered + LRU).

  • reduced

    Improve

    Reduced monthly cloud spend $42k by introducing spot-instance autoscaling on the analytics fleet.

  • halved

    Improve

    Halved support-ticket triage time by introducing tiered routing in Zendesk and pre-tagged macros.

  • accelerated

    Improve

    Accelerated time-to-first-deploy for new engineers from 14 days to 2 via templated dev-environment scripts.

  • streamlined

    Improve

    Streamlined month-end close from 14 days to 6 by automating reconciliations in NetSuite and Floqast.

  • optimised

    Improve

    Optimised the slowest 24 production queries; cut the daily report-generation cycle from 4 hours to 25 minutes.

  • doubled

    Improve

    Doubled qualified inbound volume in two quarters by rebuilding the lifecycle email programme around behavioural triggers.

  • grew

    Improve

    Grew weekly active users from 18k to 42k over 9 months via three onboarding-funnel experiments.

  • lifted

    Improve

    Lifted mobile-checkout completion 22% via single-page redesign + Apple Pay default.

  • increased

    Improve

    Increased renewal-revenue retention from 96% to 108% over the year via a redesigned QBR cadence.

  • compressed

    Improve

    Compressed average POC-to-closed-won cycle from 84 to 41 days by introducing structured technical discovery.

  • eliminated

    Improve

    Eliminated a recurring class of duplicate-payment incidents by introducing idempotency keys across 4 services.

  • scaled

    Improve

    Scaled the events platform from 800 req/s to 14k req/s peak without increasing infra spend.

  • modernised

    Improve

    Modernised the legacy Rails monolith by extracting 4 critical services into Go; cut p99 latency 38%.

  • consolidated

    Improve

    Consolidated 9 SaaS contracts under a single procurement framework; saved $1.2M annually.

  • boosted

    Improve

    Boosted MQL-to-SQL conversion from 19% to 33% via tighter lead-routing rules and weekly sales-marketing syncs.

  • improved

    Improve

    Improved customer-onboarding NPS from 7.1 to 8.8 by redesigning the first-week communication cadence.

  • tuned

    Improve

    Tuned the recommendation model's ranking head; lifted click-through rate 14% in the holdout A/B.

  • raised

    Improve

    Raised forecast accuracy from 73% to 91% via MEDDPICC discipline in weekly pipeline reviews.

  • lowered

    Improve

    Lowered total cost-per-order from $4.20 to $2.80 via warehouse-network rationalisation.

  • led

    Lead

    Led a 5-engineer team through a 6-month migration off legacy services with zero customer-facing downtime.

  • directed

    Lead

    Directed the brand-refresh programme across 14 markets; raised prompted brand awareness 28% → 41%.

  • managed

    Lead

    Managed a 9-person sales team to 124% of $24M quota with 7 of 9 reps at or above plan.

  • coordinated

    Lead

    Coordinated 14 vendors and 3 internal teams through a $4.2M ERP rollout; on schedule, 6% under budget.

  • drove

    Lead

    Drove the Q3 roadmap refresh across product, design, and engineering; killed two bets and re-funded the highest-ROI surface.

  • owned

    Lead

    Owned the activation funnel for the freemium tier; raised week-1 retention from 28% to 41% across two quarters.

  • headed

    Lead

    Headed the integrated holiday campaign across paid, PR, and social; drove 22% YoY revenue lift in the window.

  • mobilised

    Lead

    Mobilised a cross-functional incident-response team across 4 functions; resolved a P0 outage with 14-minute MTTR.

  • spearheaded

    Lead

    Spearheaded the platform-tenancy initiative; authored the RFC adopted across 14 services in 2 quarters.

  • mentored

    Lead

    Mentored 4 engineers through their first staff-level design reviews; 2 promoted to senior in the next cycle.

  • coached

    Lead

    Coached 3 product designers in research planning; all now run their own end-to-end discovery studies.

  • championed

    Lead

    Championed the company's first accessibility programme; closed 184 WCAG violations across the customer dashboard in 6 months.

  • facilitated

    Lead

    Facilitated quarterly strategy offsites for 14-person leadership team; outputs adopted as the FY25 plan.

  • supervised

    Lead

    Supervised 3 staff auditors on SOC 1 engagements; zero quality findings on partner review.

  • chaired

    Lead

    Chaired the architecture-review board across 22 design reviews in the year; killed 6 proposals not grounded in measured need.

  • presided

    Lead

    Presided over quarterly board reviews for 3 portfolio companies; presented results that informed the annual investment thesis.

  • guided

    Lead

    Guided 2 PMs through their first 0-to-1 launches; both shipped on time and hit first-quarter usage targets.

  • stewarded

    Lead

    Stewarded the brand guidelines across 7 product surfaces; cut average review-cycle time from 9 weeks to 5.

  • orchestrated

    Lead

    Orchestrated a 9-team deprecation programme over 4 quarters; retired the legacy event bus with zero incidents.

  • captained

    Lead

    Captained the response to the largest customer escalation in team history; retained $2.4M ARR through structured root-cause work.

  • resolved

    Solve

    Resolved a 14-month race condition in the checkout flow that had cost ~$30k/month in lost transactions.

  • diagnosed

    Solve

    Diagnosed the root cause of recurring billing-pipeline failures; introduced idempotency keys and DLQ replay.

  • debugged

    Solve

    Debugged and patched a memory leak in the events service; cut weekly OOM-restart incidents from 8 to 0.

  • fixed

    Solve

    Fixed the 7-year-old reporting bug that had been silently double-counting refunded transactions across 4 product lines.

  • recovered

    Solve

    Recovered $42k in duplicate vendor payments across 3 clients via a reconciliation audit; closed the loophole with a deduplication policy.

  • remediated

    Solve

    Remediated 184 WCAG 2.1 AA violations across the customer dashboard in 3 months; unlocked enterprise procurement reviews.

  • repaired

    Solve

    Repaired a strained vendor relationship after a major SLA breach; renegotiated terms and recovered the account.

  • identified

    Solve

    Identified a $620k segment-leakage pattern in the gross-margin dashboard; informed the Q4 pricing reset.

  • investigated

    Solve

    Investigated 12 P1 incidents across the year as the on-call incident commander; cut median MTTR by 41%.

  • untangled

    Solve

    Untangled a 22-table schema-evolution backlog; cut downstream dashboard breakage from 14/month to 1.

  • patched

    Solve

    Patched a critical auth-bypass discovered during the SOC 2 audit; verified mitigation across 9 client surfaces in 36 hours.

  • uncovered

    Solve

    Uncovered $480k in unused enterprise software licences during a vendor audit; reallocated spend within the same quarter.

  • addressed

    Solve

    Addressed the highest-volume support topic (password reset) via in-product self-serve; cut ticket volume 38%.

  • restored

    Solve

    Restored on-call rotation health by introducing post-incident handoff reviews; on-call satisfaction up from 4.2/10 to 8.6/10.

  • stabilised

    Solve

    Stabilised flaky e2e suite by rewriting the highest-failure 22 tests; CI pass rate up from 71% to 96%.

  • advised

    Influence

    Advised the new GTM team on segmentation; shaped the ICP definition that drove their first $1M in pipeline.

  • influenced

    Influence

    Influenced the company's pricing-model shift through three working sessions with the leadership team; projected $4.8M annual impact.

  • shaped

    Influence

    Shaped the Q3 product roadmap via two research studies that flagged a pivot opportunity adopted by leadership.

  • persuaded

    Influence

    Persuaded the executive team to kill a planned 6-quarter rebuild after a 2-week prototype showed mobile-web met 92% of the use case.

  • aligned

    Influence

    Aligned product, design, and engineering around a single quarterly bet; cut roadmap-debate cycle from 6 weeks to 1.

  • negotiated

    Influence

    Negotiated a $2.1M multi-year renewal with 14% price uplift after a value-engineering exercise grounded in usage data.

  • advocated

    Influence

    Advocated for the customer-experience reset programme through 4 leadership reviews; secured 2 dedicated headcount and shipped v1 in 14 weeks.

  • educated

    Influence

    Educated 9 internal teams on the new analytics platform via a structured rollout; reached 84% active adoption in 60 days.

  • evangelised

    Influence

    Evangelised the design-system migration across 6 product teams; cut per-team UI work in half within two quarters.

  • lobbied

    Influence

    Lobbied for a budget reallocation from underperforming display ads to content; pipeline contribution rose 38% in the next quarter.

  • convinced

    Influence

    Convinced the procurement team to consolidate 9 SaaS vendors under a single framework; saved $1.2M annually.

  • partnered with

    Influence

    Partnered with finance on a pricing-elasticity model that informed the $4M Q4 revenue plan change.

  • collaborated

    Influence

    Collaborated with engineering on the real-time notifications stack; shipped to 280k DAU over 11 weeks.

  • consulted

    Influence

    Consulted on 4 cross-functional initiatives spun out of the strategy team; 3 shipped within their target quarter.

  • promoted

    Influence

    Promoted the new tier launch through 14 channel partnerships; attached $1.8M of first-quarter pipeline.